Preliminary Risk Assessment

Every floor tells
a different story.

Enter your building's parameters below. The risk dial updates in real time — no email required to see where your tower stands.

GET FULL RISK PROFILE
Preliminary Risk Score
--
AWAITING DATA
Low0–24
Moderate25–49
Elevated50–74
Critical75–100
Risk Factor Breakdown
Enter building data to generate risk factors →

← Input building parameters to activate

0
Concealed Defects

Average per tower inspected — items invisible to standard walk-throughs

$0.0M
Deferred Maintenance

Uncovered last quarter across 11 buildings — before boards approved a single line item

0%
First-Pass Failures

Of luxury towers fail envelope testing on initial Highrise inspection

Thermal Imaging Analysis — Floor 14, NW Façade
Ambient
Normal
Warm
Hot
Critical
Moisture Migration — Floors 10–20
FL 10FL 15FL 20
01 — Envelope Intelligence

The moisture your property
manager doesn't know about
is already in your walls.

Infrared thermography maps temperature differentials invisible to the naked eye. In the building shown, a 27-square-foot moisture intrusion at the northeast spandrel had been active for an estimated 14 months — during which the board approved a $340,000 lobby renovation. The façade repair, discovered during our inspection, came to $1.2M.

3.5×
Cost amplification per year undetected

Industry data shows moisture intrusion remediation cost increases 3.5× for every 12 months it goes undiagnosed. Early detection is not a service — it's leverage.

Applicable to:
Condo BoardsReserve StudiesPre-Sale Due Diligence
02 — Reserve Fund Intelligence

The gap between what boards
budget and what buildings
actually need.

A forty-year reserve study built on assumptions is a liability document, not a financial plan. Highrise provides the forensic building data that actuaries need to close the gap — cataloging actual system conditions, not manufacturer life-expectancy tables.

68%

of condo boards are underfunded by more than 30% at the time of first major capital event

$2,400

average per-unit special assessment when reserve studies miss a major system failure

11 yrs

average time between full building envelope inspections in luxury residential towers

ANALYZE MY BUILDING'S RESERVE GAP
Reserve Fund Gap Projection — 40-Year Horizon
$11M$8M$5M$2M$0
2026
2028
2030
2032
2034
2036
Funded Reserves
Required Reserves
$6.9M
Projected reserve gap by 2036

Representing the average underfunding scenario for a 200-unit tower built in 1998 without updated forensic condition assessments. Every year this gap widens.

Building Risk Assessment

Get your building's
full risk profile.

A five-minute questionnaire. A branded PDF risk brief, hand-reviewed by a licensed inspector, delivered within 48 hours — complimentary, no obligation.

Your Preliminary Risk Brief includes:
Building age and system life-cycle analysis
Façade and envelope exposure scoring
Reserve fund adequacy flag
Recommended inspection scope
Comparable defect findings from similar towers
1
2
3
4
5

Tell us about the building.